The application of electric heater in life is more and more, how much is it for you? Let’s give you a specific introduction to its linkage and open an exception. 1. Its linkage can be divided into electrothermal tube sampling and fin tube cooling according to structural characteristics. best space heater In terms of control, there is a need to add a link between the fan and the heater to ensure that the heater starts, it is necessary to carry out the wind turbine start operation. After the heater stops working, the fan requires a delay for more than three minutes to prevent overheating of the heater and damage. In line with the NEC standard in the single loop wiring, each branch current must not exceed 48A. If you want to exceed the upper pressure specification, use a circular heater.
Second, air conditioning electric auxiliary opening generally has two cases, one is when the air conditioner is turned on, you will turn on electric revolutionary heat, after more than 20 minutes, he will automatically open electric plum No response in the electric auxiliary heat is turned on or closed. The other is that when the air conditioner is turned on, no electric revolution is turned on. After ten minutes, the electric aid will not be turned on, even if you press the button on the remote control without any reaction.
Third, the electric auxiliary function is turned on when the air conditioner is turned on, and the electric-repellent button can be turned off by powerful buttons when it is required to turn the electric aid thermal function. , With the local temperature and humidity, the frosty snow is formed, and the water is flowed through the water under the chassis, so the outdoor unit is leaking. The above is about the linkage of the electric heater and the open abnormality, I hope to help everyone. If you have more knowledge you want to know, welcome to contact us, we will serve you wholeheartedly.